EYLÜL - EKİM 2016 / SAYI 58 30 “S m o and S mulat on Model ng, Analys s, Appl cat on”, E-book Ed t on, November 30, 2011, Sayfa 39. - K m, H., Lee, S.S., Park, J.H. ve Lee, J.G. (2005): “A model for a s mulat onbased sh pbu ld ng system n a sh pyard manufactur ng process”, Internat onal Journal of Computer Integrated Manufactur ng, Vol. 18, No. 6, pp. 427441. - Lee, D.K., K m, Y., Oh, D.K. ve Sh n, J.G. (2014): “Study on a process-centr c model ng methodology for v rtual manufactur ng of sh ps and o shore structures n sh pyards”, Internat onal Journal of Advanced Manufactur ng Technology, 71, pp. 621-633. - McLean, C. ve Shao, G. (2001): “S mulat on of sh pbu ld ng operat ons”, Proceed ngs of the 33nd Conference on W nter S mulat on, IEEE Computer Soc ety, Wash ngton, DC, USA, pp. 870-876. - Mede ros, D.J., Traband, M., Tr bble, A. ve Lepro, R. (2000): “S mulat on based des gn for a sh pyard manufactur ng process”, Proceed ngs of the 32nd Conference on W nter S mulat on, Soc ety for Computer S mulat on Internat onal, San D ego, USA, pp. 1411-1414. - Park, C., Seo, J., K m, J., Lee, S., Baek, T.H. ve M n, S.K. (2007): “Assembly block storage locat on ass gnment at a sh pyard: a case of Hyunda Heavy Industr es”, Product on Plann ng and Control, Vol. 18, No. 3, pp. 180-189. - W ll ams, D.L., F nke, D.A. ve Traband, M.T. (2001): “D screte-s mulat on development for a proposed sh pyard steel process ng fac l ty”, Proceed ngs of the 33nd Conference on W nter S mulat on, IEEE Computer Soc ety, Wash ngton, DC, USA, pp. 882-887. Şekil 9: Vinçlerin yürüme hızları ile üretilen blok sayısı değişimi Şekil 10: Forkliftlerin yürüme hızları ile üretilen blok sayısı değişimi www.b2bmedya.com Sektöründe Türkiye’nin referans kaynağı olan Boat Builder Türkiye dergisinde yer alarak hedef kitlenize mesajlarınızı ulaştırabilirsiniz. www.boatbuilderturkey.com 0216 651 78 78 MAKALE
RkJQdWJsaXNoZXIy MTcyMTY=